Revetment Building

Construction of the Trimingham Revetments

1974   A construction railway was positioned behind the concrete and wooden defences as they were being built. Multiple cliff collapses left equipment damaged and forced the abandonment of sections of track, some of which can still be seen when the tide has scoured behind the defences.